Log In


Reset Password

Road work this week

The Pennsylvania Department of Transportation announces the following road work this week, but be advised that road work schedules may change as needed during COVID-19 mitigation or due to changes in the weather:

Carbon County

• Kidder Township, Route 534, surveying between Route 903 and River Road, 7 a.m. to 3 p.m. through Friday.

• Lower Towamensing Township, Lower Smith Gap Road sweeping between Fireline Road and Monroe County line, 7 a.m. to 3 p.m. on Thursday and Friday.

• Kidder Township, Route 940, pothole patching between River Road and Monroe County line, 7 a.m. to 3 p.m. on Wednesday and Thursday.

• Penn Forest Township, Hatchery Road, pothole patching between Route 903 and Pohopoco Drive, 7 a.m. to 3 p.m. on Friday.

• Towamensing Township, Preachers Camp, sweeping between Route 209 and Beltzville Dam, 7 a.m. to 3 p.m. on Wednesday.

Lehigh County

• Upper Macungie Township, Route 222 construction between Berks County Line and Tek Park Road, 8 p.m. to 6 a.m. Sunday through Friday.

• Whitehall Township/Northampton Borough, Route 329 road work between Second Street and Main Street, 9 p.m. to 6 a.m. Monday through Jan. 22.

Monroe County

• Tobyhanna, I-80 East at Exit 284 (Route 115) inspection, 9 a.m. to 3 p.m. on Wednesday.

Smithfield, I-80 East at Exit 310 (Delaware Water Gap) inspection, 9 a.m. to 3 p.m. on Thursday.

• Multiple townships, Route 33 South road work between Snydersville and Saylorsburg, 9 a.m. to 3 a.m. today and Tuesday.

• Hamilton Township, Route 33 South road work between Saylorsburg exit and Lehighton exit, 9 a.m. to 3 p.m. on Wednesday.

• Stroud Township, I-80 West road work between Exit 299 (Route 715) and Exit 302 (Route 33 to Route 209), 9 a.m. to 3 p.m. Monday through Thursday.

Schuylkill County

• Rush/Ryan townships: Route 54 between Route 309 and Mahanoy City, pothole patching from 7 a.m. to 3 p.m. today through Friday.

• Kline Township: Route 309 between Ben Titus Road and Lofty Road, pothole patching, 7 a.m. to 3 p.m. through Friday.

• Ryan/Blythe townships, Burma Road between: Morea Road and 2nd Street, pothole patching, 7 a.m. to 3 p.m. through Friday.

• New Castle/Ryan township, Route 61 between Burma Road and Interstate 81, pothole patching, 7 a.m.