Road work this week
The Pennsylvania Department of Transportation announces the following road work this week, but be advised that road work schedules may change as needed during COVID-19 mitigation or due to changes in the weather:
Lehigh County
• Upper Macungie Township: Route 22 West construction between I-78 and Kuhnsville Exit, 7 p.m. and 6 a.m. through Friday; I-78 East shoulder restriction between Exit 49 (Route 100) and Exit 60 (Route 309), 9 a.m. to 2 p.m. through Wednesday; I-78 shoulder restriction between Exit 60 (Route 309) and Exit 49 (Route 100), 9 a.m. to 2 p.m. Wednesday through Friday.
• Upper Saucon Township: Route 309 North lane restriction between Passer Road and East Saucon Valley, 9 a.m. to 2 p.m. through Wednesday; Route 309 South lane closure between East Saucon Valley and Passer Road, 9 a.m. to 2 p.m. Wednesday through Friday.
• Various townships: I-78 sweeping between Exit 59 (to Route 145) and Exit 52 (Route 222), 9 a.m. to 2 p.m. through Thursday.
• North Whitehall: Route 309 lane restriction with flagging between Route 873 and Levans Road, 9 a.m. to 2 p.m. Wednesday through Friday.
• Weisenberg: Ziegels Church Road lane restriction with flagging between Route 863 and Old Route 22, 7 a.m. to 3 p.m. through Wednesday.
Monroe County
• Various municipalities: I-80 line painting between Carbon County line and New Jersey state line, 9 a.m. to 3 p.m. through Thursday; Route 33 line painting between Northampton County line and I-80, 9 a.m. to 3 p.m. through Thursday.
• Pocono Township: I-80 West bridge repair between Exit 299 (Route 715) and Exit 293 (Jct. I-380), 9 a.m. to 3 p.m. Tuesday.
• Multiple townships: Route 33 North shoulder work/widening between Northampton County line and Snydersville Exit, 9 a.m. to 3 p.m. on Wednesday and Thursday.
• Ross Township, Old Route 115 drainage between Mount Eaton Road and Route 209, 9 a.m. to 3 p.m. through Friday.
• Tobyhanna Township, Route 940 pothole patching between Route 115 and Locust Ridge Road, 9 a.m. to 3 p.m. on Friday.
Northampton County
• Williams: Bethlehem, Lower Saucon: I-78 highway beautification between Exit 75 (to PA 611) and Exit 60 (Route 309), 9 a.m. to 2 p.m. through Thursday.
• Lehigh Township: Maple Drive shoulder work/widening between Mountain View Drive and Lehigh Drive, 9 a.m. to 2 p.m. through Friday.
• Hanover Township: Route 512 drainage between Route 22 and Crawford Drive, 9 a.m. to 2 p.m. through Friday.