Log In


Reset Password

Road work this week

The Pennsylvania Department of Transportation announces the following road work this week, but be advised that road work schedules may change as needed during COVID-19 mitigation or due to changes in the weather:

Lehigh County

• Upper Macungie Township, Route 22 shoulder work/widening between I-78 and Kuhnsville Exit, 9 a.m. to 12 p.m. on Tuesday.

Monroe County

• Pocono Township, I-80 West bridge repair between Exit 299 (Route 715) and Exit 293 (JCT I-380), 9 a.m. to 3 p.m. Monday through Thursday.

• I-80 Ramp at Exit 302 (Route 209 to Route 33) surveying and lane restriction on ramp for core work, 8 p.m. to 6 a.m. Sunday through Friday.

• Hamilton Township. Greenview Drive pothole patching on Route 209, 9 a.m. to 3 p.m. Tuesday through Friday. Again Sunday through Tuesday from 9 p.m. to 6 a.m.

Northampton County

• Lehigh Township, Walnut Drive shoulder work/widening between Main Street and Elm Street, 9 a.m. to 2 p.m. Monday through Friday.

• Lower Saucon Township, I-78 East surveying between Exit 67 (Route 412) and Exit 71 (Route 33), 9 a.m. to 3 p.m. Wednesday through July 27.

Schuylkill County

• Tamaqua, Route 309 inspection between Route 209 and Tuscarora Park Road, 8 a.m. to 3 p.m. on Thursday.

• Mahanoy Township, Route 54 East inspection between Gilberton Road and Route 339, 8:30 a.m. to 3 p.m. on Friday.

• Various townships, I-81 roadway reflector installation between Exit 112 (Route 25) and Exit 119 (Highridge Park Road), 7 p.m. to 6 a.m. Beginning on Wednesday and ending on Aug. 14.

• Frailey Township, Route 209 paving between I-81 and Joliett Street, 7 a.m. to 1 p.m. on Monday.

Nothing reported for Carbon County.