Log In


Reset Password

Road work this week

The Pennsylvania Department of Transportation announced the following road work this week:

Lehigh County

• Various municipalities, Interstate 78 construction between Exit 55 (Route 29) and Northampton County Line, Monday through Wednesday 9 p.m. to 6 a.m.

• Upper Macungie Township, Route 100 inspection between Tilghman Street and Schantz Road, Monday 9 a.m. to 3 p.m.

• Upper Saucon/Salisbury Townships, Interstate 78 East litter removal between Exit 59 (To Route 145) and Northampton County Line, Monday through Wednesday 9 a.m. to 2 p.m.

• Lower Macungie Townships, Route 100 at Columbine Street pothole patching, Monday through Sunday 7 a.m. to 3 p.m.

Monroe County

• Smithfield Township, Route 209 crack sealing between Interstate 80 and Pike County Line, Monday through Wednesday 7 a.m. to 3 p.m.

• Ross Township, Mount Eaton Road bridge repair between Old Route 115 and Lake Road, Monday through Wednesday 7 a.m. to 3 p.m.

• Route 423 shoulder work/widening between Route 940 and county line, Monday through Wednesday 7 a.m. to 3 p.m.

• Sullivan Trail crack sealing between Route 715 and Route 940, Monday through Wednesday 7 a.m. to 3 p.m.

• Chestnuthill, Lower Camp Akiba Road pothole patching between Route 715 and Neola Road, Monday through Wednesday 7 a.m. to 3 p.m.

• Ross Township, Kunkletown Road crack sealing between Old Route 115 and County Line, Monday through Wednesday 7 a.m. to 3 p.m.

Northampton County

• City of Bethlehem, Minsi Trail Bridge inspection between Route 412 and Main Street, Monday 8 a.m. to 3 p.m.

• City of Bethlehem/Bethlehem Township/Palmer Townships, William Penn Highway/Easton Avenue/Butler Street crack sealing between Elizabeth Avenue and Northampton Street, Monday through Wednesday 8 a.m. to 2:30 p.m.

• Moore Township, Route 946/Mountain View Drive brush cutting between Moorestown Road and Monocacy Drive, Tuesday 8 a.m. to 2 p.m.

• Lehigh Township, Route 248/Lehigh Drive brush cutting between Blue Mountain Drive and Valley View Drive, Wednesday 8 a.m. to 2 p.m.

• Palmer/Bushkill/Plainfield Township, Route 33 brush cutting between Route 22 and Monroe County Line, Monday and Tuesday 8 a.m. to 2 p.m.

• Upper Mount Bethel Township, Route 611/North Delaware Drive brush cutting between Turkey Ridge Road and Monroe County Line, Wednesday 8 a.m. to 2 p.m.

• Forks Township/Stockertown Borough, Sullivan Trail/Main St/College Ave/Cattell St/Knox Ave crack sealing between Bushkill Drive and Route 191, Monday through Wednesday 8 a.m. to 2:30 p.m.

Schuylkill County

• Delano Township, Interstate 81 crack sealing between Exit 131 (Route 54) and Exit 138 (Route 309), Monday through Wednesday 7 a.m. to 3 p.m.

• Foster Township, Interstate 81 pothole patching between Exit 112 (Route 25) and Exit 119 (Highridge Park Road), Monday and Tuesday 7 a.m. to 3 p.m.

Nothing to report for Carbon County.