Published November 11. 2014 04:00PM
The covered bridge in the Little Gap section of Lower Towamensing Township opened
Monday, providing a short cut from the village to the Blue Mountain Ski Area. The bridge has been closed since the summer, while crews repaired damage from vehicle strikes. The project, which cost $291,126, included replacing the open-grid steel deck, sandblasting and painting the bridge and was covered by Act 13 bridgeimprovement funds, along with Act 44 funds. See the story on Page 3.
TERRY AHNER/TIMES NEWS