Log In


Reset Password

Engineer: no changes needed at intersection

Lower Towamensing Township's engineer doesn't believe any changes are necessary to the signage that exists at a busy intersection.

Board of Supervisors Chairman Brent Green on Tuesday read a letter the township received from Ron Tirpak, of Carbon Engineering Inc., in response to his review of the current signage at the intersection of Covered Bridge Road and Lower Smith Gap Road.In his letter, Tirpak stated that "in reviewing this matter, I wish to note that rather than a standard T-intersection, this intersection is somewhat unorthodox with the merging of traffic onto Covered Bridge Road from either direction off Lower Smith Gap Road."Tirpak continued in his letter "it appeared the major traffic flows are on Little Smith Gap Road, westbound traffic on Little Smith Gap Road turning onto Covered Bridge Road, and Covered Bridge Road traffic turning left onto Little Smith Gap Road. Traffic flow from Covered Bridge Road turning right and eastbound traffic on Little Smith Gap Road turning left onto Covered Bridge Road appears to be minimal, and thereby contributes to the efficient operation of this intersection.""During my site visit, there did not appear to be any serious conflicts or problems with the traffic," Tirpak said. "Although, I did note that in most cases, vehicles did not come to a complete stop when entering Little Smith Gap Road in either direction."Tirpak added "if there were a number of accidents or other problems at this intersection, consideration should be given to reconstructing the intersection to a standard-T Intersection, eliminating the merging of traffic on Covered Bridge Road. I wish to note that reconfiguring this intersection to a standard T-intersection will decrease the efficiency of this intersection, since currently this intersection allows vehicles to enter onto Little Smith Gap Road heading left and right simultaneously. It will also require a permit from (Pennsylvania Department of Education) PennDOT.""In conclusion, based on my site visit, this intersection appears to be functioning adequately, and does not need to have any changes to the existing signage," he said. "It was quite obvious that drivers were aware of the stop signs as they approached the intersection; they just did not comply with the requirement to stop."Afterward, resident Herman Bollinger, who for several months requested that an additional stop sign be placed near the intersection, noted there have been several accidents there."Must we wait until somebody gets killed?" Bollinger asked. "That's baloney."The the most recent accident occurred in January.