Published August 09. 2017 02:46PM
Forms and steelwork are being installed at the west end of the D&L pedestrian bridge over the Lehigh River in Jim Thorpe in preparation for pouring concrete for the bridge pier at that end of the structure while work on the opposite bank of the river continues in the background. VICTOR IZZO/SPECIAL TO THE TIMES NEWS