Construction work on the new SR309 Center Street bridge is causing bumper to bumper traffic to be backed up over a mile in both directions. Related construction is expected to continue this week. The new bridge project is estimated to be done by May 2013.
Traffic jam stretches through South Tamaqua
Related Articles
-
Bridge opens in Tamaqua 11/16/2012
-
Bridge work results in traffic headache 11/10/2012
-
Tamaqua bridge work progressing 6/15/2012
-
Temporary bridge being built in Tamaqua 10/27/2011
